Life of Field Capability

Decommissioning

Decommissioning and abandonment are specialised activities that require meticulous planning and the best use of technology, equipment and resources to control costs, ensure safety at the worksite, protect the environment and maintain operator reputation.

Offshore facilities are often large and complex structures that require a spectrum of skills and techniques for their removal. From well abandonment and removal through to subsea infrastructure removal and platform removal, Acteon companies combine to deliver an integrated decommissioning management service.

Floating production, storage and offloading (FPSO) facility removal and redeployment

The ability to redeploy an FPSO facility means that its capital cost can be spread over the lives of several small field... read more

Project planning and management

From end-of-field-life determination to final lease clearance, InterAct can assist with every aspect of facility abandon... read more

Cutting and recovery

Cutting and recovery operations are some of the most demanding activities to be tackled during decommissioning. read more

Rigless plugging and abandonment

As more fields reach the end of their productive lives, operators are increasingly faced with well decommissioning proje... read more

Well plugging and abandonment studies

InterAct is frequently called upon to permanently abandon or re-abandon old or problematic subsea wells. Its project tea... read more

Flowline and umbilical recovery

Aquatic's project management team advises and guides customers on the best fit for their projects, often by combining di... read more

S2S MagazineS2S Magazine

S2S issue 10

Seabed 2 Surface magazine: Your source of information on our projects. Download latest pdf Browse latest issues

Product & Service GuideProduct & Service Guide

Product & Service Guide

Please download for full information on our Products & Services. Download pdf